This Monday the maintenance staff put in a drain to eliminate the wet spot in front of the three trees on the left side.
First, a sod cutter was used to cut the grass out so it can be replaced after trenching.
The crew cuts it into smaller pieces so it's easier to move.
After the sod is set to the side, the trencher begins digging the ditch.
The pipe is rolled out and drainage boxes are installed.
The pipe and fittings are layed into the ditch.
The dirt is pushed back onto the pipe and it is packed with a tamper. Then the sod is placed back on top.
Once the sod is replaced, the roller levels everything back to normal.
No comments:
Post a Comment